Backup Power
The problem. Data centres, hospitals and production lines cannot ride through a grid interruption on UPS batteries alone — the runtime is measured in minutes and the load is measured in hundreds of kilowatts. Adding a generator solves the long outage but leaves a gap while it spins up, and diesel is expensive to run for short events.
How storage helps. A battery cabinet sits between the grid and the critical load, carrying the site through the transfer window and covering short interruptions without starting the generator at all. Capacity is selected from your critical load and the ride-through time you need, not from a catalogue default.
What to specify. Continuous kW must cover the critical load; kWh must cover the ride-through window plus a healthy margin for battery ageing. Cooling choice matters if the room is not climate-controlled.
Recommended: OHL-233 / OHL-261 (125 kW, liquid-cooled) · OHC-A 50kW/200kWh where air cooling is preferred
Request quotation
Peak Shaving
The problem. Commercial and industrial sites pay for both energy and demand. Demand charges are set by the highest short interval of the month, so a handful of peak hours can drive a large share of the bill — and the peaks are usually predictable.
How storage helps. The cabinet discharges during those peak windows and recharges outside them, capping the site's draw from the grid. The value depends entirely on your tariff structure and load shape, which is why we ask for a load profile before quoting rather than promising a figure.
What to specify. Discharge power sets the demand reduction you can physically achieve; usable capacity sets how long you can hold it. Cycling duty drives the cooling and cell choice — daily deep cycling is a different job from occasional backup.
Recommended: OHL-233 / OHL-261 for daily cycling duty · FH-233 / FH-261 where low ambient temperatures are expected
Request quotation
PV + Storage
The problem. A PV array produces when the sun is out, but a factory or cold store usually loads hardest in the evening and overnight. Without storage the surplus is exported at whatever the grid pays, and the site still buys expensive power later.
How storage helps. The cabinet absorbs midday surplus and releases it when the site needs it, shifting self-consumption instead of export. It also lets you keep the array's output usable during short grid disturbances rather than dropping the inverter.
What to specify. DC voltage window has to match the inverter's MPPT range, and the daily cycle has to fit the array's real output profile across seasons — not the roof's nameplate rating.
Recommended: OHL-233 / OHL-261 (150–950 V DC, PV-ready) · OHC-A series for smaller arrays
Request quotation
On savings figures: we do not publish payback periods or "save X% on your bill" claims. Those numbers depend on your tariff, load profile, cycling strategy and local regulation — they are calculated per project, with your data, not asserted on a website.